This document presents the results of an assessment of a fine milling treatment applied to the M25 under a departure from standards granted by Highways England. As a requirement of the departure TRL was commissioned to monitor the skid resistance, friction and surface condition at two locations that were treated in March and September 2015 respectively. The monitoring was carried out as a series of five surveys undertaken between May 2014 and May 2017.

Want to know more about this project?